Cleanup. Match-moving. Rotoscopy. All three, on one spot, in about 10 days.

Most projects need one or two of these. GMC Red Carpet needed all three, and a lot of each. It was a challenge, and we pulled it off without too much effort.

What helps on a 10-day schedule. The three jobs overlap. Rotoscopy and tracking can start as soon as the plates arrive, and cleanup can follow shot by shot. Planning the order matters more than working harder.